Download software tagged by fix corrupted msproject
The most popular program: Quick Slide Show 2.00
more info |
We recommend: Fix My Disk 1.0
more info |
SysInfoTools Image Repair Tool 19.0 by SysInfoTools Software
2020-10-09
If you have got damaged or corrupted image files? Then go with the professional method to fix and repair distorted picture from your Window System; Use SysInfoTools Image Repair software. It is programmed to handles any kind of damage on an image.
BKF Recovery - Corrupt BKF File Repair 4.02 by Nucleus Data Recovery
2006-08-03
Nucleus BKF Recovery, corrupt bkf file repair tool, repairs corrupted backup archive files corrupted due to backup process failure due to unexpected system shutdown, virus attacks or CRC errors.
Auslogics Registry Cleaner 2.3.0 by Auslogics Software Pty Ltd
2012-06-15
Cluttered and corrupted Windows Registry leads to various system errors, crashes, and failures. Auslogics Registry Cleaner is a reliable and FREE tool that will fix the Registry and ensure fast, stable, and error-free computer performance.
AVS Registry Cleaner 2.1.2.224 by Online Media Technologies Ltd., UK
2010-09-30
Scan, clean and fix Windows registry and PC entries with AVS Registry Cleaner. Remove trash files from your system and speed up its performance! Scan DLL files, search for broken links and corrupted applications.
SysInfoTools MS Word DOCX Recovery 2 by SysInfoTools Software
2015-12-14
MS Word DOCX Recovery tool handles corruption from DOCX files with ease and recovers maximum possible data from them. The recovery from DOCX files is executed in standard & advanced mode, and preview of recovered data is seen in text and image form.
AnyMP4 Video Repair for Mac 1.0.6 by AnyMP4 Studio
2023-10-19
AnyMP4 Video Repair for Mac will fix your corrupted videos within clicks. During the fix process, there is no data leakage. It is safe to fix videos via AnyMP4 Video Repair for Mac. Before saving, you can preview the fixed videos.
RegMedic 2.4.05 by Easy Desk Software
2005-10-25
RegMedic can fix a corrupted Registry or install a new one, even when Windows cannot. This means no more formatting, no more reinstalling Windows. Fix all those little annoying non-function problems in Windows.
Data Recovery NTFS 12.08.06 by Data Recovery NTFS
2009-08-18
Advance Data Recovery NTFS Software to recover & restore lost ntfs data, files & folders from deleted or corrupted ntfs file system. NTFS data recovery tool successfully supports NTFS & NTFS5 partition of windows operating system.
Repair Damaged PSD File 1.0.0.11 by Fix Photoshop File
2016-04-06
Repair Damaged PSD File is one of the best software to repair Photoshop files which refuse to open. It is efficient and finest tool to fix damaged or corrupted Photoshop PSD and PDD files on both Windows and Mac OS based computers.