Download software tagged by fix corrupted msproject
The most popular program: Quick Slide Show 2.00
more info |
We recommend: Nucleus Kernel Word Document Repair Software 4.03
more info |
Recovery for Exchange Server 5.0.1017 by Recoveronix Ltd.
2010-04-28
Recovery for Exchange Server is a data recovery program for Microsoft Exchange Server database files (.EDB/.STM). Recovery for Exchange Server stores recovered data in PST files and makes the user able to get the lost data back.
Recovery for Sybase 1.1.0937 by Recoveronix Ltd.
2009-09-11
Recovery for Sybase is a powerful data recovery software for damaged Sybase database files (.DAT). Recovers tables and table data, indexes, primary keys and stored procedures, etc. Supports Sybase Adaptive Enterprise Server 12.x, 15.0 files.
Recovery for OneNote 2.1.0938 by Recoveronix Ltd.
2009-09-16
Recovery for OneNote is a powerful data recovery software for damaged Microsoft OneNote files (.ONR). Recovers corrupted notes and their folder assignments. Restores pictures in JPEG, PNG and GIF formats. Supports Microsoft OneNote 2003.
Actual Rar Repair 2.0.1 by NSoftware
2006-10-17
Actual Rar Repair is a tool to repair RAR archives. Full automation of recovery process and several useful features, including batch mode, multi-volume archives recovery and ability to fix rar files of any size make it a must in your software bank.
RAR Recovery Toolbox 1.1.17 by Recovery Toolbox
2014-02-13
Try RAR Recovery Toolbox and decompress corrupted archives of RAR format without the usage of external data recovery services and other applications. This tool does not have some kind of system requirements, it works on any PC.
Actual Rar Repair 3.0.1 by EmailAdept.com
2009-03-08
Actual Rar Repair is a tool to repair RAR archives. Full automation of recovery process and several useful features, including batch mode, multi-volume archives recovery and ability to fix rar files of any size make it a must in your software bank.
SysInfoTools MS Word DOC Recovery 1 by SysInfoTools Software
2015-11-04
MS Word DOC Recovery tool of SysInfoTools helps you recover invaluable data from corrupted or inaccessible DOC files of all major versions of MS Word. It recovers your maximum possible data and allows you to see their preview in text and image form.
MOV File Repair Tool(Windows & Mac) 2.0.0.16 by MOV File Repair Tool
2016-08-11
MOV file repair tool is used to fix and recover corrupted/ damaged/broken MOV files. It can recover MOV files that is corrupted through virus, header corruption, playing MOV files on incompatible multimedia player or while converting file format.
SysInfoTools DBF Recovery 2.0 by SysInfoTools Software
2018-01-12
Corrupt database files of Visual FoxPro or any other database applications? Do you want your database files back? Stop being worried now and get advanced DBF Repair software to repair your corrupted database files.