Download software tagged by free fix corrupted msproject
The most popular program: Quick Slide Show 2.00
more info |
We recommend: NTFS Data Recovery Fix 2.0
more info |
Fix Corrupt Mov Files Mac 1.0.0.25 by Repair Corrupted Movie
2016-07-31
Fix Corrupt MOV File Mac Software has ability to restore missing data from failed hard drive on all versions of Mac operating system such as Leopard, Lion and latest versions within few simple steps
Fix USB Drive File System 3.2 by rBits
2016-11-02
Fix USB drive file system and recover deleted, partitioned, corrupted & formatted pen drive data with accurate information by using Pen Drive Recovery Software. The tool quickly fix & repair pen drive data which is inaccessible
VeryPDF PDF Repair 2.0 by verypdf.com Inc.
2017-08-07
VeryPDF PDF Repair can fix damaged PDF files. You can use PDF Repair Tool to analyse PDF files against corruption, repair or recover content from corrupt files. PDF Repair is a powerful PDF recovery tool. Recover damaged PDF files. Repair PDF files.
Object FIX ZIP 1.0 by Regall, LLC
2005-10-27
Object FIX ZIP is the program for repairing ZIP archive files reconstruct the specified Zip file and try to create a new Zip archive recovering files from Zip file where possible.
Object FIX ZIP 1.6 by Regall LLC
2007-04-25
Object FIX ZIP is the program for repairing ZIP archive files reconstruct the specified Zip file and try to create a new Zip archive recovering files from Zip file where possible.
Object FIX ZIP 1.6 by Regall LLC
2007-04-26
Object FIX ZIP is the program for repairing ZIP archive files reconstruct the specified Zip file and try to create a new Zip archive recovering files from Zip file where possible.
How to Fix Exchange Email 8.7 by EDB Recovery Tool
2017-04-05
If exchange EDB file became corrupted due to any reason then use Exchange Server Email Recovery Software that allows best process to know How to Fix Exchange Email and safely restore data of exchange to PST
Recovery for PowerPoint 3.1.19636 by OfficeRecovery
2014-06-06
Recovery for PowerPoint fixes corrupted Microsoft PowerPoint presentations. Supports all modern file versions: PowerPoint 2010, 2007, 2003, 2002, 2000 and 97. Recovers text formatting: font size, style, type face, text color. Available for Windows NT/2000/XP/Vista/7/2003/2008
Recovery for Word 5.0.19634 by OfficeRecovery
2014-06-09
Recovery for Word fixes corrupted Microsoft Word documents. Supports all modern file versions: Word 2010/2007/2003/XP/2000/97/95/5.0). Recovers password-protected files (if it is known). Available for Windows NT/2000/XP/Vista/7/2003 or 2008 Server