Download software tagged by fix corrupted msprojectserver
The most popular program: Quick Slide Show 2.00
more info |
We recommend: Stellar Excel Recovery - MS Excel Repair / Recovery Software 1.0
more info |
DBF Recovery 3.65 by HiBase Group
2013-03-07
If your DBF files have been corrupted, standard DBF readers won't work.DBF Repair Tool can recovery your dbf files. Unlike most of the competitors, it not only fixes headers but also analyzes actual data structures and tries to fix them too.
Repair Tool for Outlook Express 1.4 by NSoftware
2005-10-27
Repair Tool is a precision-engineered yet simple utility to heal corrupted emails in Outlook Express. Simply select the file to recover, specify the folder you want to save your messages to, click the Recover button and voila!
Recovery for Outlook Express 1.2.0845 by Recoveronix Ltd.
2008-11-11
Recovery for Outlook Express is a standalone utility that is used to recover the corrupted mail files from Microsoft Outlook Express versions 4, 5, 5.5 and 6. Available for all modern platforms: Windows 95/98/NT/2000/ME/XP. Recovers file attachents.
Advanced Zip Repair 2.0 by DataNumen, Inc.
2012-12-17
Advanced Zip Repair (AZR) is a powerful tool to repair corrupted Zip files and Self Extracting(SFX) files. It can scan the Zip archives and recover your data in them as much as possible, so to minimize the loss in file corruption.
Rar Repair Tool 2.0 by ZRT Labs
2006-04-14
Rar Repair Tool is a tool to repair RAR archives. Full automation of recovery process and several useful features, including batch mode, multi-volume archives recovery and ability to fix rar files of any size make it a must in your software bank.
Nucleus Kernel Zip Repair Software 4.02 by Nucleus Data Recovery
2006-05-10
Nucleus Kernel Zip is a advance easy and user friendly file repair software for corrupt [.zip] files. Software uses QFSCI technology to repair corrupt or lost Zip files.
Digital Photo Recovery 3.0.1.5 by Windows Data Recovery
2007-04-10
Accidentally deleted digital picture recovery software retrieve corrupted data from digital camera hard drive. Utility support restoration of files from secure digital smart media multimedia memory card recover MOV AVI RIFF MPEG GIF TIFF PNG JPEG JPG
Hard Drive NTFS Partition Recovery 2.0.1.5 by Data Recovery Software
2006-08-03
Recover hard disk drive windows ntfs ntfs5 partition corrupted deleted data files folders restore unformat unerase formatted erased master boot record file table mbr mft partition table rescue retrieve data loss repair fix damaged doc mdb documents
NTFS Hard Drive Files Recovery Tool 8.0.8.3 by Data Recovery Tools
2024-04-10
Recover hard disk drive windows NTFS NTFS5 partition corrupted deleted data files folders restore unformat unerase formatted erased master boot record file table MBR MFT partition table rescue retrieve data loss repair fix damaged doc MBD documents