Download software tagged by fix corrupted msproject
The most popular program: Quick Slide Show 2.00
more info |
We recommend: Zip File Recovery 1.0
more info |
Excel Recovery Software 10.10.01 by Data Recovery Software
2011-05-17
Excel recovery software is a Microsoft Excel worksheet recovery software designed to recover and restore corrupted excel files. Kernel Excel extracts text even from heavily damaged .xls files and never deletes original file from disk.
BKF Recovery Tool 5.5 by BKF Recovery Tool
2013-06-18
Now BKF recovery tool in 5.5 version with updated features, BKF file recovery software has become one of the most powerful software that easily read, open and restore corrupted Microsoft backup files.
Stellar Phoenix Excel Recovery 3.2 by Stellar Information Systems Ltd.
2010-09-10
Stellar Phoenix Excel Recovery software is designed to repair and restore corrupt Excel spreadsheets and other excel elements such as charts, lists, tables, images, formulas, integers, hyperlinks, etc. which have been corrupted and damaged.
Partition Recovery Bootable CD 3.5 by YIWO Tech Ltd
2008-07-29
Partition Recovery Bootable CD is the DOS Partition Recovery software for hard disk partition repair. It's designed to resolve partition problems to recover the deleted, lost and corrupted partitions.
The Mechanic 2009.176 by The Mechanic
2009-08-17
The Mechanic Hard Drive Recovery Software. Easily locate and recover hard drive crashes with FAT32 drives, NTFS drives, corrupted partitions, invalid drive specifications, disk boot failures, and boot sector problems. 100% Money Back Guarantee!
Bad CD/DVD Recovery 2.40 by JuiceSoft
2010-06-11
Bad CD/DVD Recovery is the leading data recovery software for CD, DVD. Bad CD/DVD Recovery can effectively recover and rescue corrupted or lost data from damaged, unreadable, formatted or defective disks.
SIM Card SMS Recovery Software 3.0.1.5 by Data Recovery Digital Camera
2024-04-16
Freeware simcard data recovery tool restores deleted data in text format at user specified location on desktop or laptop PC. SIM card restoration tool retrieves and fix your deleted text SMS messages, contact name and numbers.
Recover Data for MS Backup 1.0 by Recover Data
2010-06-10
Recover Data for MS Backup recovery software & MS backup repair tool to repair & restore corrupt BKF file, which are corrupted due to backup interruptions, virus attacks, CRC errors & etc. BKF repair software easily recovers emails, music files, etc.
Damaged DOCX2TXT 0.52 by S2 Services
2009-05-08
This program will extract the text even from damaged or corrupted Word 2007 docx files. It succeeds at doing so where Word 2007 itself fails to salvage text. The program is coded in Perl/Tk with a GUI interface.