Download software tagged by alternative to msproject 2000 server
The most popular program: Quick Slide Show 2.00
more info |
We recommend: MySQL Move to Another MySQL Database Software 7.0
more info |
Enterprise Mail Server 5.21 by Emailarms
2011-12-15
This is a high-performance SMTP POP3 server program with a lot of security features and options that allow you to stop DDoS attacks as well as safely block SPAM and spammer. It is also ideal for laptop PC users who travel a lot and have to use differ
Local SMTP Server Pro 5.27 by PC-Safety
2013-03-15
SMTP server program to send email messages without help of your ISP, directly from your local PC to recipient mailboxes and use your favorite email client along with this software the way you used to do it before.
Paradox to Oracle Server Conversion Software 7.0 by Sobolsoft
2007-04-21
Transfer tables from Paradox to Oracle databases. Importing and exporting can be done without SQL knowledge. This program is designed for Paradox 5 databases. Higher versions of Paradox databases can be saved as 5 and used with this program.
GFI WebMonitor for ISA Server 4.0 by GFI Software
2007-09-15
GFI WebMonitor for ISA Server lets you to control your Internet users’ browsing habits through web categorization & web filtering. Also monitor downloads in real-time, to protect your network from viruses, spyware, malware & phishing attacks.
MSSQL to MYSQL Conversion Tool 9.0.1.5 by DataRecoveryBook.com
2022-01-19
Database conversion software for MSSQL server to MYSQL server converts table data. MSSQL to MYSQL converter tool supports all data types, attributes, primary key, unique key and foreign key. Software support Unicode architecture and data integrity.
2008-03-09
Backup data from one MS SQL Server to another. Login information for databases is required.
MS Access to MySQL Conversion Utility 3.0.1.5 by ConvertMyDatabase.com
2022-02-18
Universal database conversion program converts or transfers complete or some selected records from MS Access database to MySQL server. DB converter tool also has the ability to merge or overwrite the converted database records with MySQL server.
Sentry-go Quick Server Monitor 4.3 by 3Ds (UK) Limited
2008-11-10
Easily monitor your Microsoft Windows Server, take automatic action and/or alert you to issues if they arise. Checks include services, processes, disk space, performance, event logs & network connectivity. Quick & easy to install, configure & manage.
ExpanDrive 1.8.4 by ExpanDrive, Inc
2010-07-08
ExpanDrive is a ridiculously SFTP client for Microsoft Windows that lets you connect to any SSH server and access the remote files as if they were on a USB Drive connected to your PC. It allows you to save and edit directly on the remote server.