Download software tagged by alternative to msproject 2000 server
The most popular program: Quick Slide Show 2.00
more info |
We recommend: FileVista 1.0
more info |
Baby Web Server 2.7.2 by JM software
2019-04-27
This program was build as an alternative for Microsoft's IIS. The main goal was to design a simple web server with support for ASP.
Baby Web Server 2.7.2 by JM software
2019-04-27
This program was build as an alternative for Microsoft's IIS. The main goal was to design a simple web server with support for ASP.
Baby Web Server 2.7.2 by JMRR Software
2019-05-26
This program was build as an alternative for Microsoft's IIS. The main goal was to design a simple web server with support for ASP.
Excel Export To Multiple PDF Files Software 7.0 by Sobolsoft
2009-02-13
Convert one or many MS Excel files into PDF format without Adobe Acrobat. Excel 2000 or higher required.
Fastream IQ Web/FTP Server 11.5.1R by Fastream Technologies
2008-09-22
Secure multi-threaded HTTPS/FTPS server combo for Windows 2000/XP/2003/Vista/2008 with speed limits, storage quotas, authentication, dynamic DNS, SSL, GZip, events, filter, logging, CGI, ISAPI, ultra-fast cache and remote GUI!
WinWebMail Server 3.7.1.2 by WinWebMail
2006-08-02
WinWebMail Server - Web Mail Server for Windows NT, 2000, XP, 2003. Supporting WebMail, S-MIME(RSA, DSS), SMTP, SSL-SMTP, POP3, SSL-POP3, IMAP4, SSL-IMAP4, TLS-SSL, AntiSpam, AntiVirus, BBS, Calendar, CA Server
2006-10-22
Change case for values in MS SQL Server 2000 or 2005 tables. Change to upper case, lower case, title case (proper case), and sentence case. The data found in each field of a table can be quickly converted.
ACCESS to SQL2000 3.11 by Cirdir Soft
2007-06-16
Access to the database transplant database SQL Server 2000. Opened ACCESS database and SQL database server at the same time, we will be able to migrate ACCESS table a one-time to SQL SERVER 2000.
DBF to SQL2000 2.0 by Cirdir Soft
2007-06-26
Dbf to the database transplant database SQL Server 2000. Opened DBF database and SQL database server at the same time, we will be able to migrate DBF table a one-time to SQL SERVER 2000.